[columns]
[column width=”2/3″]
Projects
Italferr – Adriatic Railway line
ENGINEERING SUPPORT SERVICES AQ 2000000831
ADRIATIC RAILWAY LINE: VENETO, FRIULI VENEZIA-GIULIA, EMILIA-ROMAGNA, MARCHE, ABRUZZO, MOLISE AND PUGLIA
Description of the work
Support services regarding preliminary, final and detailed environmental studies and plans; experimental measures and investigations; environmental monitoring project; environmental aspects of setting up sites; management and reclamation of contaminated sites; management of excavation soil and rocks; checking of environmental design and green area works on the Adriatica line.
Articulation of activities
- Support for the preparation of the environmental impact study
- Support for drafting the environmental plan of the Bari Sud Final Detailed Project
- Support for the drafting of the environmental impact study of the preliminary project Fortezza – Verona, Lot 4 urban entrance to Verona
- Risk analysis in the context of the railway link of the Taranto Port complex with the national network.
- Verification of the final project design Brescia – Verona
- Drafting of reclamation project for the contaminated site at the New Freight Yard and connection with the Logistics Platform – Port of Taranto link with the national network.
[/column]
[column width=”1/3″]
Design and drafting of environmental studies
Design, urban traffic plan and land management
Commissioner:
Italferr
Start-end year
2012 – current
[/column]
[/columns]